rv7build.com
Left Flap Rigging: 5.0 hrs - Building an RV-7
August 12, 2020 Installed the left flap today and did the fuselage cutout for the flap push rod. I started by drilling a pilot hole through the side skin and opened it up to fit the small dremel sanding disk. I also drilled a hole down through the floor that would allow the dremel to... Continue Reading →
Paul