rv7build.com
Seat Backs: 7.0 hrs - Building an RV-7
June 19, 2020 A lot of miscellaneous things today, but it sure took a long time to do them. I tried fabricating the tunnel cover and messed it up. The drawings show the hole spacing on the cover plate, but don’t give dimensions for how the plate mounts on the stand-off Z channel. We assumed... Continue Reading →
Paul