rv7build.com
Vertical Stab: 5.5 hrs - Building an RV-7
July 21, 2020 Today was the day for the vertical stab to be drilled in place. After clamping it in place and measuring from the top of the tail to the skins on the horizontal stabs, we took our time to make sure it was perfectly centered. After a few rounds of measuring and moving... Continue Reading →
Paul