Seat Backs: 7.0 hrs

June 19, 2020 A lot of miscellaneous things today, but it sure took a long time to do them. I tried fabricating the tunnel cover and messed it up. The drawings show the hole spacing on the cover plate, but don’t give dimensions for how the plate mounts on the stand-off Z channel. We assumed... Continue Reading →

Floor Nut Plates Part II: 8.0 hrs

June 18, 2020 Today the glove was still inflated so we took a soapy bottle of water and started spraying everything. No bubbles could be found so we called it good and cleaned everything up. We’re waiting on some click-bond stand-offs to be able to tie down the wires for the fuel level sender before... Continue Reading →

Floor Nut Plates Part I: 5.5 hrs

June 17, 2020 The side stiffeners that run under the top forward skin are shipped with the quick build kit with two half round aluminum pieces that hold them in place. These aren’t mentioned anywhere in the plans, so we assumed they were jigs to hold the stiffeners in the correct location. After drilling the... Continue Reading →

Fuselage Skin: 8.3 hrs

June 16, 2020 Since we have a bunch of stuff on order for the wings, we went back to working on the fuselage. Paul made the elevator bell-cranks and spacers and temporarily installed the assembly. Elevator Bell Crank We then installed and match drilled the top forward skin that sits right behind the baggage compartment.... Continue Reading →

Wing Conduit: 5.0 hrs

June 15, 2020 Today was all about wiring. We settled on ½” shark bite PVC for the wiring conduit a while ago. It's lightweight, cheap, and used by quite a few builders. I couldn’t come up with a good way to attach it to the wing ribs until I came across Panduit MHSS-SS-D lightening hole... Continue Reading →

Sealing The Fuel Tanks: 8.0 hrs

June 14, 2020 With the tech inspection complete, we were finally ready to seal up both of the fuel tanks. Since the sealant is only good for a couple of hours once it's mixed we had to have everything sorted and planned to make the most of our time. First up, to permanently install the... Continue Reading →